How to choose the right irrigation machine

    Source: China Agricultural Machinery
    Irrigation machine is a kind of power machine, pump, pipe, nozzle, mobile devices and other facilities,cast bronze according to irrigation methods combined with the overall package as irrigation equipment, the pressure water jet to the low altitude, after the spraying of the same uniform as the rain fall to crops and land surface. Commonly used in sprinkler irrigation machine has a small machine, large irrigation machine, sprinkler machine translation, mobile irrigation machines, paper reel irrigation machine, pointer sprinklers, center pivot irrigation machine,bronze bushing circular sprinklers, irrigation machines double-cantilever other types. Many irrigation purposes, mainly for crops, nursery, livestock pasture, vegetables, fruit trees, crops, grass and flowers garden. In addition, for environmental control (such as dust, wind, hot wind proof, anti-frost cooling, etc.), wastewater treatment, aeration ponds,dry bushing and integrated spraying liquid fertilizer, herbicides, chemicals, pesticides, insecticides and so on. Adaptive irrigation strong, almost any crop, soil, topography, region, climatic conditions apply.

    Sprinkler irrigation to save water,plain bearing save time, improve land use, is conducive to crop yield, adaptability features.

    Should pay attention to the purchase of irrigation machine

    1. Irrigator must meet the standard requirements: buy sprinklers should first check whether their products meet national standards, sleeve bushing industry standards or local standards. No national standards, industry standards or local standards of sprinklers, should be above the provincial level technical supervision departments for the record of corporate standards.

    2. Nozzle and pipe pressure must meet the requirements: the requirement should be based on scientific and rational selection of sprinkler heads and pipes, sprinkler heads depends not only on the quality of work performance, more importantly,DU bushing depends on the combination of work pressure nozzle and the branch pipe inlet pressure pipes is the irrigation district design.

    3. Supporting pipes and fittings must be chosen qualified products: Using the matching pipe and fittings shall meet appropriate technical standards and testing agencies have issued by the provincial full-term test report.

    Sprinklers should be noted in the course:

    1. Preparing for Use: ① The V-belt drive, the power machine spindle and pump must be parallel to the pulley to be aligned,bushing the center distance of not less than two pulley diameter and 2 times. When the pump is connected with the power machine should be equipped with a common chassis, can be jaw-type flexible coupling, pay attention to the power machine spindle and pump shaft concentricity. ② pump mounting height (to absorb the pool water as the base) should be below the allowable height of suction on the vacuum 1-2 meters. The soil should be a solid operating position to prevent the collapse or fall into the ground. ③ water piping installation should pay special attention to prevent leakage.brass bushing Filter should be completely submerged in water, the depth of 0.3 meters, and with the bottom, wall to maintain a certain distance, to prevent the inhalation of sand and other impurities and air. ④ the laying of water pipes, hoses should be avoided with stones, bark and other objects, friction, and pedestrians to avoid trampling on the wheels rolling, Mould guide plate do not touch and running parts. Hose should be rolled into coils move, do not touch the ground. Tube should be split into single-handling, moving against multiple sections together to prevent wear and damage to the pipes and joints. Avoid exposure and rain pipes, plastic pipes to prevent deformation or aging. ⑤ will support the jet aircraft on the ground, spraying face frame joints should be placed level and a fixed jet aircraft. Spray nozzles installed in the rack, check the nozzle rotation is flexible, pull tension arm to see whether the appropriate amount of oil filling in the rotating parts. Then wipe clean and quick connector connected. ⑥ start, check whether the correct shaft rotation direction, rotation speed is uniform, can not have stuck, different sound, plastic bushing which are not normal. ⑦ pump before starting to fill the water pump should be, to be filled with water pipes and the pump only after the start.

    2. Precautions: ① the pump starts, 3 minutes without water, should be down to check. ② pump operation in the event of irregularities (noise, vibration, water drop, etc.), should be immediately shut down, pay attention to bearing temperature, the temperature should not exceed 75 ℃. ③ The nozzle is working properly, whether the rotation is uneven, too fast or too slow, even rotation phenomenon. Observed shift is flexible, with or without anomalies. ④ should avoid excessive use of sediment concentration for irrigation water, or easy to wear the pump impeller and nozzle of the nozzle. Adjust the nozzle speed, can tighten or loosen the spring arm to achieve. Rocker was suspended support shaft in the arm, rotating adjustment screw bit into the water to adjust the depth of the head arm to control the head speed. Can be changed to adjust the position of reverse speed. Head speed of adjustment ⑤ good sign that does not produce surface runoff in the premise, as far as possible slow rotational speed, usually a small nozzle for the 1-2 minutes to 1 ring, the nozzle 3-4 minutes to 1 ring, large nozzle 5-7 minutes to 1 lap.

    3. Unit maintenance.

    ① loose parts on the unit should be promptly tightened. ② The lubrication of the lubrication sites to time to ensure good lubrication and operating normally. ③ unit power machine, water pump maintenance, should be the use of instructions. ④ stop using the unit for a long time when the water in the pump body must be let go, dismantling the pump, the nozzle, wipe the water-soaked, oiled assembly, import and export of mechanical package will be good, parked in a dry place preservation. Pipeline should be washed and dried (hose rolled coils), placed in a cool dry place. Do not store the parts in a pH and high temperatures. ⑤ threads on the rack (or fast connection) and easy to grease the rusty parts should be properly stored.